Cambs Compressors Autumn 2020

www.cambscompressors.co.uk AUTUMN ‘Keeping the heart of Industry Pumping’ With the need for more video conferencing, video diagnostics and social distancing Cambs Compressors have invested in upgraded command centre facilities. Command centre facilities evolve to support customers more efficiently This facility was designed to support the distribution depot in St Ives with the administration support and become a back-up for call management. During lockdown and the need for minimal travelling it became clear that the call management needed to be located at the Stoke Rochford hub. Stoke Rochford hub for Cambs Compressors The realisation of likely changes in the way the business would need to look, operate and functional space required set us on the path to up-scaling the technology, internet access speed and office space required. The new Buckminster facilities will support the future growth plans in addition to the changes in working practices required for working COVID Safe. The new facilities have super broadband connectivity and over three times the office space to enable social distancing even if we expand the workforce. Protecting our customers and employees throughout the coronavirus crisis Working to support essential sectors and keep things running Like every business on the planet Cambs Compressors was impacted by the COVID-19 pandemic. Although many of our wider team were furloughed during the lockdown, our engineering team were working hard as we continued to provide compressor servicing and compressor emergency breakdown support for essential services. The food industry, hospitals, research laboratories were just a few who relied on their compressed air systems running. At the height of the lockdown meant our engineers had to adapt their safe working procedures, implement social distancing and carry documentation to evidence they were operating an essential role. Contributing to the Ventilator Programme In addition to this the team at Cambs Compressors also got involved in the Ventilator Programme with a consortium of manufacturers throughout the region. As engineers working at the height of the crisis gave us a sense of proactive contribution when our normal services were largely reduced to reactive support. “ I couldn’t have asked for more from the team at Cambs Compressors. I feel an enormous sense of pride at the way in which our team conducted themselves during these unprecedented times.” Mark Fryer Managing Director, Cambs Compressors New Buckminster premises with hi-speed internet The ‘new normal’ – post-COVID-19 at Cambs Compressors

RkJQdWJsaXNoZXIy NDY1ODc=